"The Bridge" will be a graphical representation of the critical path of execution required in order to achieve a sustainable biosphere. Critical elements would be 'owned' by key volunteers in the areas actually working in that area or sector of the endeavor. SPS construction needs aerospace engineers working on those projects today in space agencies. Coral reef health needs marine biologists currently involved in those aspects. etc.
The result of combining these will be an ability to "manage the gap". The gap is the difference between "available sustainable energy" and "death of the biosphere" both based on what we know now. Gap management must be completely transparent to encourage open participation by businesses, entrepreneurs, and individuals to maximize innovation along the spectrum of vantage points, especially in engineering necessary solve the very real situation we are in and address the issues, and challenges as we implement the solution to achieve the vision.
Task and sub-project compartmentalization of critical path elements and data owners
Task to critical path time alignment management features
The objective is to leverage credible, capable, responsible volunteers in key aspect areas as 'data owners' for the elements of the example time line being demonstrated. The demonstration then becomes quasi real in the sense that it represents a 'first pass' draft level take on our collective ability to actually accomplish the vision. Managed in real time it would also show everyone in almost real time the extent of damage impact to our oceans and fish populations as we work elements along the time line. The faster we accomplish objectives lessens the impact.
Fewer than 500 actual users of the "demonstration system".
When we are done it will allow participation by key
scientists and individuals within the constraints of the example
depicted. The intent is not to provide the actual timeline; rather it
is to provide an example of what that timeline might actually look
like. It will be up to institutions more capable that our meger
efforts here to implement that master timeline. We only hope our
effort here can provide inspiration to those that must actually get the
job done.
This is a simple list of elements that will need to be integrated into this project management plan in order to achieve success. Each on their own is an incredibly complex topic so please don't beat us up too bad. If you think we've left something out or need to restructure something a different way then please let us know using the feedback form.
Biosphere Derived Metrics
Business Integration Elements
Critical Path (Key elements without which assure failure.)
Economic Elements (Global, National, & Local Scaled elements. | Phased Tax Revenue Shift Plans, Economic Integration of Implementation, etc.)